EPB46
DESIGN Wind and SDC A&BPost base designed to be cast directly into wet concrete. Allows for 1" to 2 1/2" clearance above concrete (2" for EPB44A). Standoff pipe is 1 1/16" OD x 8".
| Hanger Width | 5 1/2" |
|---|---|
| Hanger Depth | 3" |
| Ga | 12 |
| L | 3 5/16 |
| Fasteners Nails | (12) 0.162 x 3 1/2 |
| Uplift Uncracked 160 | 995 |
| Uplift Cracked 160 | 695 |
| Download 100 | 5165 |
| F1 160 | 850 |
| F2 160 | 965 |