EPB44A
DESIGN Wind and SDC A&BPost base designed to be cast directly into wet concrete. Allows for 1" to 2 1/2" clearance above concrete (2" for EPB44A). Standoff pipe is 1 1/16" OD x 8".
| Hanger Width | 3 9/16" |
|---|---|
| Hanger Depth | 2 3/8" |
| Ga | 14 |
| L | 3 |
| Fasteners Nails | (8) 0.162 x 3 1/2 |
| Uplift Uncracked 160 | 1075 |
| Uplift Cracked 160 | 755 |
| Download 100 | 2670 |
| F1 160 | 695 |
| F2 160 | 795 |